PDCA cycle in stainless steel processing
The core of market competition in quality competition, business focused, client continuous development, the fundamental problem is to solve quality problems
Our company in the steel processing industry to sustainable development, quality control up and down in great effort, especially in the implementation of the PDCA management, a lot of quality issues from a fundamental solution.
Deming PDCA cycle is also called ring, quality management expert Dr. Dai Ming the United States first proposed, it is total quality management of scientific procedures to be followed. Total quality management activities of the whole process is the quality of the plan and organize the process of implementation, this process is in accordance with the PDCA cycle, keeps rolling operation.
PDCA is the English word Plan (Plan), Do (implementation), Check (check) and Action (action) the first letter, PDCA cycle is to follow this order of quality management, and the cycle than to carry on scientific procedures.
The operation of total quality management activities, can not do without management cycle of rotation, that is, to improve and solve quality problems, catch up with advanced work in all scientific procedures using PDCA cycle. Both improve product quality, or reduce the nonconforming product, have to go, the objectives, that is, to what extent improved quality, lower reject rate how much? Must have a plan; this program not only targets, but also the need to achieve this goal measures; plans to introduce later, we must follow the plan to check to see if it is at achieving the desired results, have not achieved the desired goals; through inspection to identify problems and causes; final should be processed, the experiences and lessons learned into the formulation standard form system.
PDCA cycle of total quality management system as the basic method of operation, their implementation requires large amounts of data to collect information, and comprehensive use of various management techniques and methods.
PDCA cycle has three characteristics:
① quality management at all levels have a PDCA cycle, forming a large ring small ring sets, inter-related, and check each other and complement each other an organic whole, as shown in Figure 8-5. In the PDCA cycle, the general said, on a cycle basis for the next one cycle, the next one is on a loop cycle of implementation and concrete.
② each PDCA cycle, cycle of operation are not in place, but as climbing stairs, as each cycle has a new goal and content, which means quality control, after the first cycle, solving a number of issues, the quality levels the new increase, as shown in Figure 8-5.
③ In the PDCA cycle, A is a critical cycle.
Application of implementing standards: GB / T 19001, GB / T 28001 standard management thinking
【P (Plan)】:
GB / T 19001: plan, plan (responsibilities goal man, machine, material, method, ring test 5W1H); GB / T 28001: three aspects of planning (hazard identification, laws and regulations to identify, target indicators
And programming)
【D (Do)】:
- Clear responsibilities (Department / post quality, security functions)
- Resources assurance (competence, awareness, special operations personnel eligible for induction, GB / T 28001: security staff, fire, security monitoring, security, lightning protection facilities, etc.)
- Preparation of documents (both standard coherence emphasis)
- Information exchange and communication (internal and external)
- Implementation: Compliance trace Management
GB / T 28001: operation control (key fire safety, security grab (property and money), traffic safety, information security) Emergency Preparedness and Response (training and implementation of the plan document)
【C (check), A (action)】: inspection and continuous improvement
- Daily work (quality) checks, security checks
- Objectives, targets to complete the periodic verification
- Check the performance of safety management
- Evaluation of legal compliance
- Unqualified (product) rectification, (GB / T 28001) incident investigation and treatment.
Last year we did a number of British customers of stainless steel shelf, from production to small batch production sample customer satisfaction, PCD three sectors are doing well, but in the small group there was a problem when shipped, the customer is loaded containers to go goods in the packaging design did not consider the size of containers within the box, the products, large volume results in an empty container on the accounting for the low rate of freight made up, this time we do step A, to communicate with customers, raise reasonable improvement of packaging, from the 65% duty cycle to 93%, saving shipping costs for customers in the mass obtained very good results, customer satisfaction. Completed a good part of PDCA.
This year we do a clothing chain store brands of fashion display, PDC has been done, but customers are not satisfied, because: the greater the brand products to customers not only demanding on the clothing rack display the same strict, in two intersecting Chu tube is welded to our P re-grinding polishing, but the customer can not see the welding line, can only see the round pipe cutting edge, we passed QC panel discussion agreed that must two intersecting areas for tube welding, TIG welding torch on to improve, extend the welding head, which in the pipe welding, pipe first and then sealed. The use of such technology to meet customer requirements, new development of PDCA cycle, to meet customer requirements.

Summary:
PDCA: the first by the father of Statistical Quality Control for the United States Shewhat (Hugh Hart) for the PDS (Plan Do See) evolved from the United States to improve the quality of management experts as Deming PDCA model, it is also known as "Deming ring."
PDCA meaning as follows: P (PLAN) - plan; D (Do) - Executive; C (CHECK) - check; A (Action) - action on the summary results of inspections deal of successful experience to be sure and appropriate promotion, standardization; failed to sum up the lessons, put unresolved issues in the next PDCA cycle.
More than four runs once the process is not over, but the conduct of the cycle, a cycle is over, to solve some problems, not solve the problem into the next cycle, this ladder to rise.
PDCA cycle is actually the work of any effective logical procedures. In quality management, quality management, some people call it the basic method.